...
• One tab for mapping fields from Enterprise Tester to the defect trackerexternal system (JIRA).
• One tab for mapping fields from the defect tracker to the the external system (JIRA) to Enterprise Tester
Task | Configurable | Description |
---|---|---|
Map Fields | Yes | Allows a set of mappings to be configured to transfer information between the source and destination system.Enterprise Tester and the External System (JIRA) |
Map Attachments | No | Synchronizes the set of attachments between Enterprise Tester and External System (e.g. JIRA). This will add new attachments that have not been synchronized previously, and remove previously synchronized attachments that have since been removed. |
Create Trackback Comment | No | Adds a comment to the synchronized JIRA requirement with the following text: Linked to Enterprise Tester requirement - e.g. Requirement: http://server/EnterpriseTester/#/requirement/edit/04e7f9e5-5784-4e94-a863-9ef600f0a935 (Name: ) If a comment already exists with the same value, then the comment is not added. |
...