...
Task | Configurable | Description |
---|---|---|
Map Fields | Yes | Allows a set of mappings to be configured to transfer information between the source and destination system. |
Map Attachments | No | Synchronizes the set of attachments between Enterprise Tester and External System (e.g. JIRA). This will add new attachments that have not been synchronized previously, and remove previously synchronized attachments that have since been removed. |
Synchronize Comments | Yes | Synchronizes all comments added in either ET or JIRA to the other system. |
Add Trackback Comment | Yes | Adds a comment to the synchronized JIRA requirement incident with the following text: Linked to Enterprise Tester incident - e.g. Requirementincident: http://server/EnterpriseTester/#/incident/edit/04e7f9e5-5784-4e94-a863-9ef600f0a935 (Name: ) If a comment already exists with the same value, then the comment is not added. |
...
Task | Configurable | Description |
---|---|---|
Map Fields | Yes | Allows a set of mappings to be configured to transfer information between the JIRA and ET. |
Map Attachments | No | Synchronizes the set of attachments between from JIRA to ET.. This will add new attachments that have not been synchronized previously, and remove previously synchronized attachments that have since been removed. |
Synchronize Comments | Yes | Synchronizes all comments added in JIRA to ET. |
Add Trackback Comment | Yes | Adds a comment to the synchronized JIRA requirement incident with a trackback link to the ET incident: Linked to Enterprise Tester incident - e.g. Incident: http://server/EnterpriseTester/#/incident/edit/04e7f9e5-5784-4e94-a863-9ef600f0a935 (Name: ) If a comment already exists with the same value, then the comment is not added. |
Note that all activities are pre-configured including the Map Fields activity. To view the fields that are pre-configured to synchronize, click on Map Field and then click Config from the toolbar.
...